| # | Input | Type | Used in step |
|---|---|---|---|
| I-1 | Work Order RELEASED — one WO per Master Plan Big Plan (Style · Model · Base Color · SPRAY/Logo · Area, P.O Month = Plan Month), carrying the Routing chosen on Master Plan | Document — Master Plan | Start → Generate WIs per WO Routing process |
| I-2 | Routing · Process · Work Center | Master data | Create WIs per process of the WO Routing |
| I-3 | Per-shift Injection WI — one WI per machine × day × shift (created when the Planner releases the injection schedule at Injection Schedule) | Document — Injection Schedule | Attach per-shift Injection WIs |
| I-4 | Released process plan (Trimming · Outsourcing · Packing) | Document — process Plan screen | Process plan released? |
| I-5 | Progress: shift POP CONFIRMED · process POP · FG received | Production result — MES | Change WI status from POP |
| I-6 | BOM — materials per WO | Master data | Select BOM materials and the WI to issue to |
| Step | Role | Screen · UI button |
|---|---|---|
| Create WIs per Routing process of the WO · Attach per-shift Injection WIs · Release process WIs · Change WI status from POP · Change WO status from the WIs | System (auto) | Work Order / WI · tab Work Instructions |
| Open the Work Order list · View Work Order detail | Planner | Work Order / WI · tab Work Orders (View) |
| Adjust process Plan Dates | Planner | Work Order · Plan Dates (Save Plan) |
| Select BOM materials and the WI to issue to · Create Material Out Requests by Process · WI | Planner | Work Order · Booking Material Out Request (Create Request) |
| # | Output | Produced when |
|---|---|---|
| O-1 | MOR mang WO · WI · Process → kho Stock Out theo MOR | The Planner selects BOM materials and the WI, then presses Create Request — one MOR per (Process, WI) pair; it is not a condition for creating WIs |
| O-2 | WI stays DRAFT — waiting for the process plan to be released | The Trimming / Outsourcing / Packing plan of the WO is not released yet |
| O-3 | WI RELEASED per process → shopfloor · POP | Process plan released |
| O-4 | WI RUNNING → COMPLETED (automatic, from POP) | The WI is already RELEASED and has a POP; the WI COMPLETED is the final status |
| O-5 | WO RUNNING → COMPLETED (automatic, from the WIs) | A WI is RUNNING or COMPLETED → WO RUNNING; every WI is COMPLETED → WO COMPLETED |
| O-6 | Process schedule shifted (Frozen processes kept) | Planner clicks Save Plan in Plan Dates |
| Glossary | Meaning in this flow |
|---|---|
Work Order (WO) | Production order created when the Master Plan is released; one Detail Plan (I/J Plan) maps to one WO |
WI | Work Instruction — the work order of one process; Injection WIs are per shift |
Routing | The WO process sequence; decides which WIs are created |
Process plan | Trimming / Outsourcing / Packing plan; once it is released the process WI is released |
POP | Point of Production — output reported per shift |
Frozen | A process with Good / NG / Rework, cannot be rescheduled |
MOR | Material Out Request — a request for the warehouse to issue material; one MOR per (Process, WI) pair |
Process | The process that uses the material, shown in the column Process of the tab Material (Injection · Trimming · Packing …) |
Shift | Shift of an Injection WI: Day (AB) or Night (CD) |