| # | Input | Type | Used in step |
|---|---|---|---|
| I-1 | Pending repair (PR) of the processes after Injection, each size with PR > 0 — Trimming Result (Trimming) · Process Worklist (Stitching) · Outsourcing Result (Spray Out) · Packing Result Logo (Packing Logo) · Packing Result Spray (Packing Spray) | Production result — MES | Create a Repair / Rework record for each size with PR > 0 |
| I-2 | Root Cause · Defect Reason | Master data | Select Root Cause |
| I-3 | Grade C (scrap) recorded at POP in every process, including Daily Injection (Process Injection), with Defect Reason; Pending repair does not go to Defect Records | Production result — MES | Write Defect Records rows, one row per reason |
| Step | Role | Screen · UI button |
|---|---|---|
| Open PENDING record · Enter Repaired · A- · Scrap · Select Root Cause · Tick Re-plan WO · Save repair result | QC | Repair / Rework · Rework Records table (Record) · modal Repair Result (Save Result) |
| Create a Repair / Rework record for each size with PR > 0 · Set record status · Move Repaired OK goods to Repair Inv List · Write the A- part to Common Stock · Write the Scrap part as Loss · Create make-up demand for the WO | System (auto) | Repair / Rework |
| Repair defective goods | Operator (Repair team) | At the repair area — no action on screen |
| Write Defect Records rows, one row per reason | System (auto) | Defect Records · Grade C Records table; tab Defects of Work Order Detail |
| Filter Defect Records · Export Defect Records | QC | Defect Records (Export) |
| # | Output | Produced when |
|---|---|---|
| O-1 | Save blocked — error on the Repair Result modal: "Repaired + scrap + downgrade must equal <Qty> pairs." / "Enter the root cause before closing this record." | Repaired OK + Downgrade to A- + Scrap differs from Qty, or no Root Cause selected |
| O-2 | Repair Inv List of Packing Planning Spray — Step 2 · Select Repair Inventory | Valid Save Result, Repaired OK > 0, Source Spray Out · Pending repair or Packing Spray · Pending repair |
| O-3 | Repair Inv List → Step 2 of Outsourcing Planning or Packing Planning Logo (by plan type) | Valid Save Result, Repaired OK > 0, Source Trimming · Pending repair |
| O-4 | Repair Inv List — next process not yet determined | Valid Save Result, Repaired OK > 0, Source Stitching · Pending repair or Packing Logo · Pending repair |
| O-5 | A- downgrade → Common Stock | Valid Save Result, Downgrade to A- > 0 |
| O-6 | Scrap → Loss | Valid Save Result, Scrap > 0 |
| O-7 | Make-up demand → Master Plan (re-plan WO for the Scrap quantity) | Re-plan WO ticked before Save Result |
| O-8 | Closed record · view only (button View) | Valid Save Result, Re-plan WO not ticked |
| O-9 | File Excel Defect Records | QC presses Export on the Defect Records screen |
| Glossary | Meaning in this flow |
|---|---|
WO | Work Order — production order created on Release in Master Plan; each WO brings its process plans |
POP | Point of Production — output reported at the process, per shift and per size |
Grade C | "Reject" goods are scrap — only written to Defect Records by reason, no Repair / Rework record in any process |
Pending repair (PR) | Repairable goods in the processes after Injection — when PR is entered the system creates a Repair / Rework record per size automatically; not written to Defect Records; Daily Injection has no PR |
Source | Origin of a Repair / Rework record, in the form "<Process> · Pending repair" (five values) |
Defect Records | Read-only report: one row per grade C defect reason by Process, WO, SO |
Rework Records | List of RW-nnnn repair records, one record per size with Pending repair |
Repaired OK | Pairs repaired to first quality (A / A-), returned to the next process |
Downgrade to A- | Pairs downgraded to A-, released from the SO into Common Stock |
Scrap | Pairs scrapped, recorded as Loss |
Repair Inv List | List of repaired goods waiting for the next process; only that process's Plan sees them |
Common Stock | Shared stock not tied to a P.O, re-allocated later |
Make-up demand | Make-up production need for the scrapped part, sent to Master Plan |