| # | Input | Type | Used in step |
|---|---|---|---|
| I-1 | Trimmed LOT (A + A-) of a WO with a custom in-house process in its Routing — received per SO line, no new lot | Process goods — flow trimming-result | Open SO line |
| I-2 | In-house process WI per the WO's Routing | MES document | Select process tab |
| I-3 | Defect reason (defect catalogue) | Master data | Enter Output by size |
| Step | Role | Screen · UI button |
|---|---|---|
| Select process tab · Open SO line · Select the LOT to record Output · Enter Output by size · Confirm Output · Move LOT to the next process | Operator | Process Worklist (Open SO, Enter Output / Add Output, Fill A = Open Qty, Add Defect Line, Confirm Output, Confirm & Save, Move to …, Confirm & Move, Move all recorded lines) |
| Record grade C in Defect Records | System (auto) | Defect Records |
| Open a Repair / Rework record per size with PR > 0 | System (auto) | Repair / Rework |
| # | Output | Produced when |
|---|---|---|
| O-1 | Save blocked + error message | No quantity in any grade row · recording beyond Received · grade C not split by reason or reason total differs from the C quantity |
| O-2 | Grade C → Defect Records (Process Stitching), one line per reason; no Repair / Rework record is created | Output Entry with grade C |
| O-3 | Repair / Rework record per size with PR > 0, Source Stitching · Pending repair, carrying LOT / WO / SO; not written to Defect Records | The Output Entry has Pending repair (PR) > 0 |
| O-4 | Goods move to the next process in the Routing, no new lot — LOT = TRANSFERRED | The Operator presses Move when the LOT is COMPLETED (Remaining = 0) — quantity moved = A + A-; C and PR stay in Defect Records / Repair / Rework |
| Glossary | Meaning in this flow |
|---|---|
WO | Work Order — production order created on Release in Master Plan; each WO brings its process plans |
Routing | The WO's list of processes; it decides which in-house process has a tab in Process Worklist and which process comes next |
SO line | The part of an SO allocated at Trimming; made of several LOTs, its status is derived from the LOTs |
LOT | A Trimmed lot received into the process; the unit of output recording and of the move to the next process |
In-house | A process done in the plant, not sent to an outside subcontractor |
Received | The quantity the LOT has received into the process — the ceiling of the total recorded output |
Output Entry | One output recording (per shift) of the LOT; a LOT has many entries |
A / A- / C / PR | Quality grade: A and A- are first-grade goods; C is scrap (label "Reject"), split by reason and written to Defect Records; PR (label "Pending repair") is repairable and opens a Repair / Rework record |
Remaining | Received − Already Recorded − This Entry |
Defect Records | The screen that records grade C by reason, process, WO and SO |
Repair / Rework | The screen of repair records; each size with Pending repair creates one record, source "<Process> · Pending repair" |
Repair Inv List | Stock of repaired goods, carrying the next process |